Connect 2 Cleanrooms Case Studies
Other case studies
Dual Environment for Precision manufacturing
Mini Environment for Injection Moulding
NHS Sterile Services Department (Temporary Project)
No Project Is Too Big or Too Small
Take a look at our case studies to sample the breadth of our experience. Whatever your requirement, Connect 2 Cleanrooms Ltd will have the solution.
Pharmaceuticals Packaging
Benefits
• 2 Work Areas / 1Change area / 2 Goods Transfer Areas
• 1000 Lux Lighting Levels
• Installed and validated in 4 days
• 125m2 at 2.5m high
• Hybrid design using classic Cleanroom Panels, Clear Glazing and Softwall
• 90 Air changes per Hour
• ISO Class 7 with Cascade to Class 8
Connect 2 Cleanroom design and build - Fully designed in-house using 3D CAD Solidworks system allowing full visualization and work flows to be assessed prior to build. All fabrication carried within our workshop in Kirkby Lonsdale, Cumbria. Validation to ISO14644 Part 1. Follow up service includes full 24hr 365 day engineer callout with 2 scheduled visits per year.


